(561) 486-0898answered 24/7

Limited-time offers through Dec 31: $250 off rooftop decks, 10% off studio floors, condo building deals.Limited-time offers through Dec 31See offers

ENESRUHE
Wide-plank commercial vinyl floor in a large hall.

Shops · Salons · Workplaces · Lobbies

Commercial Interior Flooring

Floors that take rolling loads and daily cleaning, put in around your opening hours.

Or call (561) 486-0898 · answered 24/7

  • Free on-site estimates
  • Led by master installer Alexander, 30 years of experience
  • Real photos of our own work

Commercial flooring

Commercial flooring chosen for the traffic, not the sample

Commercial vinyl plank going down in a large hall.
Commercial vinyl plank going down in a large hall

A floor in a business has a job. It carries customers, carts, chairs and cleaning machines, day after day.

So commercial flooring starts with how the room is used. We ask about foot traffic, rolling loads, spills, cleaning routines and the hours you can give us. Then we talk about color.

We plan and install floors for shops, offices, salons, showrooms and shared halls across Miami-Dade, Broward and Palm Beach.

Materials

Four floors for business interiors

FloorGood forWatch out for
Glue-down vinyl plank or tileRetail, offices, salons, long open roomsNeeds a very smooth slab
Click vinylSmaller rooms with light traffic, quick changesGaps at the edges, limits on rolling loads
Engineered woodShowrooms, reception areas, quiet officesSand at the door, water and wet mopping
LaminateBack offices and light retailPick a rating made for business use

Need power and data under the floor? That is a raised access floor, a different system we also build.

Rolling loads

Carts, chairs and display units

Wheels are harder on a floor than feet. A hand truck puts its whole weight on two small spots. A floating floor flexes under that and opens at the joints. A bonded floor does not.

Tell us about hand trucks, salon chairs, safes or tall shelving. Those loads decide the wear layer, the adhesive and the patching compound below it.

Cleaning

Pick a floor your cleaners can keep

  • Daily dust mopping, auto scrubber or steam: each one rules something in or out
  • Beach sand and parking lot grit, which wear the first steps inside the door
  • Walk-off mats, recessed or loose, sized for the stride of a customer
  • Chair mats or soft casters at desks
  • A finish that does not need waxing, if no one will wax it

Phases

Working around your opening hours

  1. 1

    Walk the space

    With you, the property manager or the general contractor.

  2. 2

    Plan zones

    What closes when, where stock goes, how people get in.

  3. 3

    Remove and prepare

    Old floor out, slab ground, patched and tested.

  4. 4

    Install

    Layout from the sightlines people see first.

  5. 5

    Hand back

    Each zone opens when its adhesive is ready for the load.

Loading docks, elevators, security desks and noise rules belong in the plan. We ask about them early, since they often decide the schedule more than the square footage does.

The slab

What is under an old commercial floor

Tenants come and go, and floors get stacked. Under carpet tile we may find old adhesive, patched trenches, cut-off anchors and three kinds of leveler.

Thin vinyl shows all of it. We grind, fill and skim until the surface is smooth, and test the slab for moisture as the flooring and adhesive makers require. Old tile or black adhesive in an older building may need a lab test before anyone disturbs it.

More about that work under subfloor preparation.

Edges

Entrances, thresholds and the room next door

Most trips happen where two floors meet. We plan the heights first, so transitions stay low and wheels roll over them. At the entrance the mat, the threshold and the floor should read as one step.

Stair edges and steps inside the unit get nosing that people can see and that stays put. Wall base is part of the quote if you want it to be.

New installations come with a 12-month warranty on our installation labor. Material warranties come from the manufacturer and depend on the supplier.

Commercial floor questions

Can you work at night or on our closed days?

Tell us your hours and the building's rules with your request. We plan the phases around them, and the written quote states the work times.

Can we stay open while the floor is replaced?

Often, if the space can be split into zones with a clear way in. Adhesive needs time before feet and wheels return, so each zone has its own reopening time.

Which floor holds up under rolling chairs and carts?

Glue-down vinyl rated for commercial traffic is the usual answer, because it is bonded to the slab and does not shift. See glue-down and click vinyl.

Do you work under a general contractor?

We can. Send the plans, the finish schedule and the dates with your request. Some cities also ask for a permit for a new floor in a business space. It depends on the city and the building. We check it before we quote.

Can one worn area be replaced later?

With glued planks, yes. Single planks or a strip by the entrance can be lifted and renewed. Keep a few boxes from the same batch.

Free quote

Tell us about your space

Send the city, rough square footage, opening hours, photos of the floor and any date it has to be ready.

  • Free on-site estimate
  • Written quote with clear options
  • Based in Boca Raton
  • Calls answered 24/7
  • Led by master installer Alexander, 30 years of experience
What would you like?

Phone photos are fine. We shrink them before sending.

Free, no obligation. We reply as soon as we can. By sending, you agree we may contact you by phone or email about your request. Privacy · Terms

CallBook / Free Estimate